The bridge is back up and running. The first phase of the migration actually lasted shorter than expected.
06 Dec 2022, 10:00
The bridge is back up and running. The first phase of the migration actually lasted shorter than expected 😄👌
Same news in other sources
1HydraHYDRA #1118
06 Dec 2022, 14:17
👉 Phase 2 of the Migration is Starting!
Today at 15:00 UTC time, the Hydra/Ethereum cross-chain bridge will enter another maintenance period, as part of the technology upgrade. The maintenance is expected to last no longer than 24 hours. If you need to swap assets in the short-term, please do so in advance.
Phase 2 of the Migration is Starting.
👉 Phase 2 of the Migration is Starting!
Today at 15:00 UTC time, the Hydra/Ethereum cross-chain bridge will enter another maintenance period, as part of the technology upgrade. The maintenance is expected to last no longer than 24 hours. If you need to swap assets in the short-term, please do so in advance.